Brisktrade Offshore Completes a Pipeline Integrity Re-validation Contract for Amni International Ltd

Brisktrade Offshore has successfully completed a Pipeline Integrity Re-validation contract for Amni International Petroleum Development Company Limited, at the Ima Field, Offshore Bonny, Nigeria. The project is the first call-off issued on the master contract awarded for a duration of one year to Brisktrade Offshore in November 2018
Amni are the operators of the Langley Offshore Production Unit, located at the Ima Field, OML 117 block. The Langley OPU is located in 8m depth of water, and is connected by a bridge to a 12 slot Wellhead Platform (WHP).
The Ima crude oil received from the WHP is processed on the Langley and transported via a 12” subsea export pipeline to a Floating Storage & Offloading vessel (Ailsa Craig-1) located in about 25m depth of water.
Amni intends to increase the production of oil through the 12” export pipeline from 700bopd to 25,000bopd, hence Brisktrade Offshore was awarded the contract to validate the integrity of the 12” export pipeline.
Comments for this post are closed.